Landed cost · one unit

Six stages between the factory and your shelf.

A real batch: 5,000 units of furniture, 12 m³, from a factory in China to a warehouse in Germany. Scroll — and the cost of a single unit assembles itself on the right, line by line.

5,000units in the batch
12 m³volume
32–38days in transit
Scroll to follow the unit
01 / 06 · Factory floor

It starts with a number the factory chose.

Ex-works price, MOQ met, samples approved. This is the only figure most buyers ever see — everything after it is yours to pay.

+ €4.20per unit
02 / 06 · Quality control

Someone has to open the boxes.

A sample check and a photo report before you release the balance. Rework at the factory costs less than a return from your customer.

+ €0.04 – €0.05per unit
03 / 06 · Port of departure

Paper moves slower than pallets.

Export declaration, drayage from the plant, terminal handling. Three invoices — and if the documents disagree, a week of demurrage nobody budgeted.

+ €0.05 – €0.10per unit
04 / 06 · Ocean leg

32–38 days of nothing happening.

The rate you were quoted is the ocean leg. Bunker, currency and terminal surcharges arrive later, on separate documents.

+ €0.28 – €0.42per unit
05 / 06 · Import customs

The code decides the cost.

Duty for this category runs 0–5.6 % of the customs value, import VAT 19 % on top. One digit in the HS code moves the whole number.

+ €0.00 – €0.26per unit
06 / 06 · Your warehouse

The price you actually sell against.

Only here does the real unit cost exist. Everything before this point was an estimate — and most margin calculations quietly use the factory price instead.

+ €0.10 – €0.18per unit

Know the number before you send a deposit.

A Landed Cost Check gives you the exact figure for your product — HS code, duty, VAT, freight and delivery. Ready in 48 hours.

Order the check — €149 Or calculate yours